Pump Storage Power Plant Grimsel 3
The Grimsel 3 Pump Storage Power Plant will be situated underground and uses water between the existing lakes of Oberaar and Räterichsboden.
Most Important Construction Stages:
- Pressure shaft from Kessiturm pressure shaft to the new Grimsel 3 plant
- New power plant with 3 regulated 200 MW pump turbines
- Tailwater tunnel to Lake Räterichsboden
Benefits:
- Balancing irregular energy sources (e.g. wind and solar)
- Providing systematic services for grid stabilisation
- Capacity approx. 600 MW
- Investitment approx. 600 million CHF (2006, +/- 20 %)
- Construction duration: 6 years