The  Grimsel 3 Pump Storage Power Plant will be situated underground and uses water between the existing lakes of Oberaar and Räterichsboden.

Most Important Construction Stages:

  • Pressure shaft from Kessiturm pressure shaft to the new Grimsel 3 plant
  • New power plant with 3 regulated 200 MW pump turbines
  • Tailwater tunnel to Lake Räterichsboden

Benefits:

  • Balancing irregular energy sources (e.g. wind and solar)
  • Providing systematic services for grid stabilisation
  • Capacity approx. 600 MW
  • Investitment approx. 600 million CHF (2006, +/- 20 %)
  • Construction duration: 6 years