Stilling Basin Innertkirchen

To ecologically enhance the Aare River, water which comes from the KWO's power plants will first run into a stilling basin. From here the water will be gently introduced back into the Aare. The stilling basin serves the purpose of reducing hydro-peaking.

Most Important Construction Stages

  • Stilling basin with a volume of 50'000 m3
  • 25 turbines to reduce speed of current into the Aare
  • neew tailwater tunnel to basin at Innertkirchen 2

Benefits/Facts & Figures

  • Reduction of hyro-peaking from 8:1 to 5:1
  • Energy increase 2 GWh per year
  • Investment 15 million Francs